In Texas construction, uncertainty is part of the terrain literally and figuratively. From unpredictable weather and fluctuating material costs to permitting delays and site conditions, every project carries risk. That’s why smart contractors build contingencies into their bids not as a hidden profit buffer, but as a strategic tool to manage the unknown.
Contingencies are essential for protecting your bottom line, maintaining client trust, and ensuring project success. But they must be handled carefully. Too vague, and they invite disputes. Too generous, and you risk losing the bid. Too rigid, and they fail to adapt to real-world conditions.
This guide breaks down how to structure, justify, and manage contingencies in Texas construction bids, with a detailed table of contingency types, best practices, and real-world examples to help you bid smarter and build better.
What Is a Contingency in Construction?
A contingency is a budgeted amount set aside to cover unforeseen costs or risks that may arise during a project. It’s not a catch-all it’s a calculated reserve based on project complexity, location, timeline, and known unknowns.
In Texas, contingencies are especially important due to:
- Volatile weather patterns (hail, heat waves, hurricanes)
- Diverse soil conditions (clay, limestone, sand)
- Regional permitting variations
- Labor and material market fluctuations
- Public vs. private project requirements
Table: Types of Contingencies in Texas Construction
| Contingency Type | Purpose | Who Controls It | Common Texas Applications |
| Contractor Contingency | Covers unforeseen costs under contractor’s control | Contractor | Labor productivity, minor scope gaps |
| Owner Contingency | Reserved for owner-directed changes or scope expansion | Owner | Design changes, added features |
| Design Contingency | Accounts for incomplete or evolving design documents | Architect or CM | Early-phase bids, design-build projects |
| Weather Contingency | Addresses delays due to rain, heat, or storms | Shared or contractor | Sitework, roofing, concrete pours |
| Permitting Contingency | Covers delays or costs from permit issues | Owner or contractor | Municipal approvals, utility coordination |
| Material Escalation | Protects against price increases for key materials | Contractor or owner | Steel, lumber, concrete, fuel |
| Unforeseen Conditions | Covers hidden site issues (e.g., rock, groundwater, asbestos) | Contractor or shared | Excavation, renovation, utility work |
Sources: AIA Resource Center, Bauwise Construction Guide
Why Contingencies Matter in Texas
Texas is a state of extremes and that affects construction in every region:
- Weather: Sudden storms, heat waves, and flooding can delay work and damage materials.
- Soil Conditions: From expansive clay in Houston to limestone in Hill Country, subsurface surprises are common.
- Permitting: Cities like Austin and Dallas have different review timelines and inspection protocols.
- Material Volatility: Steel, concrete, and fuel prices can swing dramatically, especially in high-demand seasons.
- Public vs. Private Projects: Public bids require transparent contingency documentation; private projects allow more flexibility.
Best Practices for Including Contingencies
| Practice | Why It Helps |
| Define contingency purpose | Prevents misuse and clarifies intent |
| Use a percentage or fixed amount | Standardizes budgeting and comparison |
| Document assumptions | Protects against disputes and change orders |
| Align with project phase | Early bids need more contingency than final bids |
| Separate contingency from markup | Maintains transparency and trust |
| Track contingency usage | Helps refine future estimates and improve forecasting |
| Communicate with the owner | Builds trust and allows shared risk management |
| Include escalation clauses | Protects against material price volatility |
| Reference historical data | Justifies contingency amounts with real-world precedent |
| Review local regulations | Ensures compliance with public bid requirements |
Real-World Example: Texas School Renovation
Let’s say you’re bidding on a school renovation in San Antonio. You include:
- 5% contractor contingency for minor scope gaps and labor shifts
- $25,000 weather contingency for potential rain delays during roofing
- $15,000 permitting contingency for unexpected inspection fees
- Material escalation clause tied to steel and concrete indexes
- Assumption note: “Pricing assumes dry weather and no contaminated soils. Additional costs may apply if conditions differ.”
You document these in your bid package, explain them in your cover letter, and reference historical data. The owner appreciates the transparency and you protect your margin if conditions change.
Financial Impact of Smart Contingency Planning
| Benefit | Impact on Your Business |
| Fewer Change Orders | Reduces disputes and renegotiations |
| Protected Profit Margins | Covers unexpected costs without eating into markup |
| Improved Client Trust | Shows professionalism and foresight |
| Better Forecasting | Helps refine future bids and contingency percentages |
| Faster Approvals | Clear documentation speeds up contract review |
| Stronger Reputation | Positions you as a proactive, risk-aware contractor |
Contingency Checklist for Texas Bids
Before submitting your next bid, ask:
- Have I identified all relevant risk factors (weather, soil, permitting)?
- Is my contingency amount appropriate for the project phase and complexity?
- Have I separated contingency from profit and overhead?
- Are my assumptions clearly documented?
- Have I included escalation clauses for volatile materials?
- Is my contingency aligned with public bid requirements (if applicable)?
- Have I discussed contingency strategy with the client or design team?
- Can I justify my contingency using historical data or benchmarks?
Final Thoughts
Contingencies aren’t just a safety net they’re a strategic tool. Texas contractors who handle them with clarity, documentation, and foresight can bid more confidently, manage risk more effectively, and build stronger client relationships.
At MSB Estimating, we help contractors across Texas structure contingency allowances that reflect real-world risks and align with project goals. Whether you’re bidding on a public school or a private development, we’ll help you build a smarter, safer estimate.
Need Help Structuring Contingencies?
Contact MSB Estimating today to get expert support for contingency planning in Texas bids.